Metal drip edge flashing is an important element of any roofing edge.
Replacing drip edge on flat roof.
Extend the mastic 12 inches each way from a nailed seam and eight inches from the outer edge of the drip edge onto the roof.
Hold the drip edge up to the ridge and make a mark along where the drip edge exceeds the roof.
Install roof drip edge along the eaves add underlayment then place drip.
Mark the plumb line or centerline as in the image below.
Slip the eave strip out from under the shingles.
If it doesn t pull the drip edge out slightly from under the shingles.
If you aren t able to make marks use the measurement between your rafters as a guide.
Fold the drip edge to fit over the ridge.
4 cut strips of 6 inch polyester mesh tape for each section where mastic.
Gently lift up the shingles along the lower edge of the roof and find the nails attaching the eave strip to the roof.
Make sure the outer edge extends over the gutter.
Three tips for overlapping drip edge flashing.
Tip 2 is.
How to fix a roof drip edge installing roof drip edge flashing properly.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
Rafters are usually spaced 12 in 30 cm 16 in 41 cm or 18 in 46 cm apart on center.
Save yourself some.
Tools supplies tin sn.
If you don t have a drip edge mark the measurements on the edge of your roof or on the fascia board itself.
Make a straight cut through the bottom of the drip edge with your tin snips.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Once all the underlayment is applied go back and place.
With without rain gutters.
Removing drip edge eave strips.
Installing drip edge on your roof.
Place the metal roof drip edge flashing along the gable ends.
This is important to protect damage to your fascia soffits rafters.
It bends around the edge of the roof channeling any moisture that penetrates the shingles away from the roof decking.